• Commercial - Red Central, Redhill - The project involved the demolition of an existing six storey office building and 40% of parking deck and retail units below.  New works provided a five storey building providing modern offices with refurbished offices and retail units below.Duration 78 WeeksContract Value 9.0m
  • Commercial - Orchard Plaza, Poole - This project involved the conversion of an office block, close to the seafront in Poole, into 115 luxury apartments on 10 floors.  The accommodation consists of 1, 2 and 3 bedroom apartments finished to a very high specification.   There are two retail units on the ground floor with a feature entrance lobby of frameless glass and tile feature floor and walls.  On the tenth and fifth floor the apartments were fitted out as Penthouses with large areas of decking to the balconies.Architect Terence Oâ™RourkeStructural Engineer Couch Consulting EngineersQuantity Surveyor DBK Back LimitedContract Value 11.00mContract Period 62 Weeks
  • Hotels & Leisure - This project is the second phase of a three phase redevelopment of Epsom Downs Racecourse, home of the prestigous Epsom Derby.  This phase involves the deomolition of the 1927 Grandstand and the construciton of a new racecoures Grandstand.  Construction consitsts of a steel frame structure with pre-cast terracing.  The external envelope comprises of traditional masonry, curtain walling and standing seam roof.  The internal works include a large open reception area to house the Hall of Fame, viewing boxes and cateringbar facilities.  Additional external works include traditional hard and soft landscaping.  Duration 78 weeksContract Value 18.2 millionProcurement Two Stage Design and Build
  • Commercial - Kew Gardens Herbarium and Library Extension - This project involves the construction of a new herbarium and extension to the library, comprising of a four storey concrete frame including basement, clad in curtain walling, cedar timber, brick and Brise Soleil.  The internal spaces are for the storage of plant samples for library reference and visitors use.Duration 78 WeeksContract Value 11.6m
  • Commercial - JP Morgan Chase, Bournemouth - Refresh of common parts, staircases and toilet facilities over 5 floors of an occupied office accommodation block.Architect Amos PartnershipProject Manager & Quantity Surveyor AYHContract Value 0.40mContract Period 17 Weeks
  • Commercial - Guildhall Yard, London EC2 - Internal fit-out to 4 floors to provide new offices for the Corporation of London. Architect Corporation of LondonQuantity Surveyor Corporation of LondonContract Value 1.09mContract Period 15 Weeks
  • Commercial - Cats Protection HQ, East Sussex - This development principally consists of a new cat re-homing centre, veterinary centre and administration buildings plus an Education Centre and Residential Building.  The Cattery Building is a 242 pen feline re-homing facility consisting of 7 homing blocks, 2 administration blocks and a reception area.  The Staff and Welfare Building includes 3 operating theatres and a recovery room, x-ray developing facilities, toilets, showers, staff changing and rest rooms.  The Administration Building included extensive refurbishment of an existing two storey conference centre to provide a modern three storey office environment.  Education Centre works comprised of the redevelopment of the existing building structure, envelope and infrastructure to facilitate a direct fit-out by the Client.  The Residential Block entailed the complete conversion of an existing showerWC block into a residence for the Cat Centre Manager.  Extensive infrastructure with sympathetic hard and soft landscaping works was undertaken to compliment the surroundings. Duration 72 WeeksContract Value 9.8m
  • Commercial - B & W Loudspeakers Ltd, Worthing - Construction of a 10,800 m2 high bay warehouse, factory and office on a brown field site. Project Manager & Architect Coster AssociatesStructural Engineer Dixon Hurst KempContract Value 6.06mContract Period 54 Weeks
  • Commercial - Access Point, Cosham - After the demolition of an existing warehouse and factory unit, two new industrial warehouseoffice units were constructed totalling 3800 m2.Architect Broadway MalyanStructural Engineer Gathard BrookesQuantity Surveyor Burns PlummerContract Value 2.54mContract Period 35 Weeks
  • Commercial - Stoke Park, Eastleigh - This design & build project comprised of the construction of a replacement 8400 m2 industrial warehouseoffice building.  The warehouse was steel framed with composite roof and wall cladding with traditional clad sections, loading docks and doors, personnel and a traditional power floated concrete floor slab.  The 1200 m office complex was a steel structure with fully gazed facades and flat roof single ply membrane.  Internal finishes were to a very high specification with Italian marble tiles and high quality carpeting throughout.  External works consisted of a 6000 m concrete service yard bay, with palisade fencing and electronically operated entrance gates.Architect Hamilton AssociationStructural Engineer Upton McGouganQuantity Surveyor Turner TownsendContract Value 4.0mContract Period 27 Weeks
  • Commercial - Royal Marines Depot, Poole - Demolition and construction of 3 new buildings and refurbishment of 1 unit, consisting of workshops, stores, offices, team building facilities and welfare facilities for Small Boat Repair.Mansell Design TeamArchitect TS DesignStructural Engineer Reuby & Stagg LtdMechanical DesignContractor Accolade Building ServicesElectrical DesignContractor M D Guy & Son (Verwood) LtdContract Value 4.2mContract Period70 Weeks
  • Education - University of Sussex Medical School - This state of the art new medical teaching facility procured through a two stage process forms part of the Brighton and Sussex Medical School providing 30,000 feet of space.  The project included the construction of a new 250 seat lecture theatre and the major refurbishment of laboratories linked to the existing building.Duration 52 WeeksContract Value 5.0m
  • Education - University of Sussex Medical Research Building, Sussex - This project involved the construction of a new four storey Medical Research Building with curved roof on a structural steel frame.  There is a link bridge at level 4 connecting to the original building.  Internal block walls were plastered forming offices, write-up areas, laboratories and hot and cold rooms.Duration 52 WeeksContract Value 3.3m
  • Education - Hopkins Building, University of Reading - Construction of new Life Sciences building located to the rear of Chemistry and Food Biosciences Building and linked to the latter.  The three storey building is for teaching and research with specialist extraction systems, cold rooms, offices, write up areas and common parts.  The building is highly serviced with efficient energy systems and renewable energy considerations, including rainwater harvesting. It is a steel framed building with precast floors and stairs. Architect Sheppard RobsonQuantity Surveyor Ridge & PartnersContract Value 11.0mContract period 56 Weeks
  • Education - University of Greenwich, Southwood Site - The project involved the construction of a new sportsteaching building and a new academic block situated within a live university campus.  The foundations comprised of CFA piling and ground beams.  The academic building was constructed utilising a steel frame which incorporated fairfaced concrete shear walls to the main entrance feature staircase.  The elevations were clad with brickwork, curtain walling, rainscreen cladding, Portland stone, zinc cladding and proprietry render system.  Duration 56 WeeksContract Value 7.8m
  • Education - Tiffin Girls School, Surrey - The project involved the construction of a three storey building to replace the fire-damaged south wing.  The building comprised of in-situ concrete frame and floors with brick-clad pre-cast concrete panels.  Remodelling of the existing foyer, refurbishment of existing staff offices and accommodation and works to existing classrooms.  Externally works comprised of hard and soft landscaping to the front.Duration 53 WeeksContract Value 4.1m
  • Education - Royal Holloway of University of London, Lecture Theatre -  The building comprises of a 400 seat lecture theatre and eight seminar rooms, two of which can be doubled in size by sliding the acoustic divider screens over to one side into a recess.  Both of these rooms can be linked to the activities in the main lecture theatre via control panels, electric white boards and projectors.  The roof of the building is copper standing seam, the exterior walls are a mixture of curtain walling, stow render, and cedar shingles cladding.     Duration 52 WeeksContract Value 5.8m
  • Education - Royal Holloway University of London, Athlone Amenity Hub - The project consisted of the alteration and refurbishment works to the Athlone Amenity Hub and minor associated external works, demolition to existing partitions and strip out of existing wall, floor and ceiling finishes; installation of new catering equipment, including dishwash carousel, new cafà area, theatre kitchen area, servery areas and kitchen.  Completely new M&E installation to provide new catering and dining facilities; new fit out of basement and ground floor area; installation of new HV transformer and switchgear to feed several buildings on the campus. Duration 16 WeeksContract Value 1.7m
  • Education - Homewood School & 6th Form, Kent - The project involved additions and alterations to a number of school buildings, including additional car parking, classrooms, drama block, sports hall and library.Phase One Sports Hall consisted of a new wing to the existing sports hall.  This was a challenging phase due to its proximity to the existing refectory and sports hall.Phase Two Drama Block consisted of demolition of swimming pool and erection of single storey purpose made drama block with provision of external performance area.Phase Three General Teaching Block three storey building linked to the existing teaching block.  Phase Four Library Block construction of a four storey building including fully functionable catering kitchens, dining areas, balcony, library, general teaching spaces, woodwork and plumbing teaching in basement.Duration 72 WeeksContract Value 7.1m
  • Education - Allenbourn Middle School, Wimbourne - This  design & build of a new 600 pupil, 2 storey school was constructed on the playground next to the existing Middle School, which was fully operational during the contract.  The school comprises 24 classrooms, toiletchanging room facilities, staff room, offices, kitchen, hall, circulation areas, library, computer room, plant room, internal paved courtyard.Mansell TeamArchitect Harding Neill & WatsonStructural Engineer Upton McGouganQS James Nisbet PartnersContract Value 4.60mContract Period 65 Weeks
  • Health - Poole Hospital, Operating Theatre - Under the PPC 2000 Form of Contract, the project comprised the refurbishment of 6 existing operating theatres, the conversion of an existing store into an additional operating theatre and recovery room, with new staff changing room, offices and plant room, in a fully operational hospital.  The site was confined, access difficult and materials storage limited. Architect The Quorum PartnershipQuantity Surveyor Whicheloe Macfarlane MDPStructural Engineer Anthony Ward PartnershipContract Value 2.40mContract Period 96 Weeks
  • Health - Corpus Christi Care Centre, Bournemouth - Constructed on three levels, included a piled and tanked basement. This building provides high quality single living accommodation with full elderly care and support facilities, restaurant, chapel and gardens laid to beech hedges and grass areas to provide a tranquil setting for contemplation.  The overall design and selection of materials has resulted in an airy, highly specified solution to the clients brief whilst achieving an extremely homely feel throughout the building.  Quantity Surveyor Boxall Sayer LtdArchitect The New Sarum PartnershipStructural Engineer Cameron Taylor BedfordM&E Engineer Buro HappoldContract Value 4.10mContract Period 72 Weeks
  • Health - Chase Farm Hospital - The works involved an extension appended to an existing ward with alterations. The site was situated within an already landscaped area with challenging access. Adjacent to the site were Surgical Theatres and a MRI Unit, which were fully functional throughout the project duration. The construction consisted of complex substructure works including the construction of 23 no. augured piles with associated ground beams to support pre cast concrete floor slabs. These had to be carefully planned due to restricted access for craneage.The superstructure works comprised of structural steel columns tied into a, Metsec steel roof proprietary lattice system. The envelope of the building was made up of a timber frame construction with a skin of facing brickwork with aluminium sash windows.  The roof finishes were made up of timber with asphalt incorporating a rooflight feature above reception area.The works also included detailed mechanical and electrical installation relating to Nurse Call Systems and Medical Gases. These works had to be incorporated into the existing hospital services whilst keeping the units functioning.Architect S & A SurveyorsContract Value 850,000Period 29 Weeks
  • Hotels & Leisure - My Hotel, Brighton - This project consists of the construction of a four storey â˜boutiqueâ™ concrete framed hotel including a contiguous piled basement with vehicular access.  The hotel is fully fitted out with 80 bedrooms including specialist fixtures and fittings and bespoke bathrooms.  Walls are clad in rendered panels and specialist curtain walling and the flat roof has a traditional hot asphalt finish.  There is a cafÃ, restaurant, bar and meeting rooms as well as 3 separate shop units, all on the ground floor.  A new car park and back-of-house facilities are located at basement level.Duration 65 WeeksContract Value 8.4m
  • Hotels & Leisure - Busey Grove Leisure Centre, Hertsmere - This new leisure centre was commissioned by Hertsmere Borough Council and provided a 25m 6 lane pool and a 16m teaching pool, a sports hall together with a health suite, gymnasium with an 83 station fitness studio, dance studios and creche.  The external features included extensive glazing and timber cladding.  In addition, the project included the provision of outdoor all-weather football and tennis facilities and extensive car parking.Duration 70 WeeksContract Value 8.0m
  • Hotels & Leisure - Basingstoke Sports Centre - The project comprised of the installation of the mezzanine floor and the refurbishment of five floors of the existing sports centre to form a new gymnasium, studios, bar, crèche and soft play area, along with ancillary areas.  A PPC2000 form of contract was used which gave the Client complete control of the project.  Duration 20 WeeksContract Value 2.0m
  • Hotels & Leisure - Andover Leisure Centre - The project involved the refurbishment of the existing local leisure centre.  It included an extension of the office facilities, a new â˜soft playâ™ area and new spa.  Also undertaken in the project was the refurbishment of the public areas and the reception area.Duration 21 Weeks
  • Retail - Marks & Spencers, Bournemouth - This project involved the complete refurbishment of an existing M&S store in the centre of Bournemouth.  The works included a new cafÃ, toliet areas, foodhall and GM areas. Duration 27 WeeksContract Value 7.4m
  • Retail - Dover Street, London W1 - Set within the Mayfair Conservation Area, 17-18 Dover Street has been completely redeveloped, in line with planning guidance.Architect KSS Quantity Surveyor Davis Langdon & Everest Value 3.2m Period 68 Weeks
  • Commercial - Kingsbury House, London W1 - Total refurbishment of basement, reception and seven floors of office accommodation in Central London.  Architect CluttonsQuantity Surveyor Murdoch GreenContract Value 1.3mContract Period 34 Weeks